Security License No. 206Operations room 24/7

Case study · Protective security

TAS Energy — PSD field missions

Protecting international and local staff on field missions to power-grid substation reconstruction sites.

Client TAS Energy
Area of operation Between Erbil and work sites in Nineveh and Kirkuk
Sector Power — substation reconstruction
Status Active contract

01Situation

Long roads through areas of varying risk

The challenge

Routes from Erbil to work sites in Nineveh and Kirkuk cross multiple high-risk zones with varying threat levels, while reconstruction progress depends on technical teams reaching site safely and on schedule.

02Action

What we put in place

  • Route assessment and planning, with daily risk briefings and primary and alternative routes
  • PSD teams accompanying international and local staff throughout each mission
  • Convoy coordination over secure radio, with real-time tracking from the operations room
  • Emergency and extraction plans prepared in advance for every movement
Mission vehicles ready at night before a move
Mission vehicles ready before a move

03Result

What every mission gets

Contract values and operational deployment details are not published, to protect our clients and personnel.

Scope

Scope delivered for TAS Energy

  • Two corridors Erbil–Nineveh and Erbil–Kirkuk
  • Every mission PSD escort coordinated by the operations room

Inside a certified management system

The project runs inside our security operations management system, certified to ISO 18788 and ANSI/ASIS PSC.1 (MSS Global, valid to January 2029), with monthly performance reviews for the client.

Compliance & certifications

Next case study

Basra · Oil & energy

Iraq Energy City — integrated security

Integrated static security for a multi-tenant energy hub: access control, watch towers, 24/7 monitoring, patrols and K9 detection.

Read the case study

Next step

Ready to discuss your security requirements in Iraq.